MG22EH5㎥タイプMG22EH2㎥タイプ

Installation

(Installation site conditions)

1.Concrete floor  50 square meters, up to ceiling 5m

2.Size of  carrying frontage : 3m × height 4m

3. It is desirable location / facility with lock.

(Location facilities)

1.Electrical equipment: three-phase 200V

2.Facility with  plumbing  and construction

3.Facility with intake and exhaust construction work

Installation support

  1. It is possible to respond in accordance with the existing facilities,  the status of your installation space and boiler building
  2.  It is also possible to carry out the design and construction management in the collectively-related construction work associated with this device installation
  3. Providing our guidance at site for the operator of client during certain period of operation, if it is required, until coming condition of complete running.
  4. Also, responding to local related constructor depend on your requirement for existing facilityand construction.

Maintenance support

Providing the maintenance by our own maintenance service network.

  1. We have “Maintenance Contract” system for the maintenance, and according the request for inspection, we will conduct the inspection as necessary with fee-charging.
  2. We accept to consult on time of receipt for question of operation, and/or, effective operation.
  3. Changing consumable parts would be replaced with actual cost.
  4. You will receive additional consulting support for the relevant environmental issues and management problems in this device

ASMETELL JAPAN .INC

Asmetel Japan inc. is a regular primary agent of MG22 (Organic magnetic pyrolysis system)
We are doing questions, consultation and consulting about introduction.