Installation
(Installation site conditions)
1.Concrete floor 50 square meters, up to ceiling 5m
2.Size of carrying frontage : 3m × height 4m
3. It is desirable location / facility with lock.
(Location facilities)
1.Electrical equipment: three-phase 200V
2.Facility with plumbing and construction
3.Facility with intake and exhaust construction work
Installation support
- It is possible to respond in accordance with the existing facilities, the status of your installation space and boiler building
- It is also possible to carry out the design and construction management in the collectively-related construction work associated with this device installation
- Providing our guidance at site for the operator of client during certain period of operation, if it is required, until coming condition of complete running.
- Also, responding to local related constructor depend on your requirement for existing facilityand construction.
Maintenance support
Providing the maintenance by our own maintenance service network.
- We have “Maintenance Contract” system for the maintenance, and according the request for inspection, we will conduct the inspection as necessary with fee-charging.
- We accept to consult on time of receipt for question of operation, and/or, effective operation.
- Changing consumable parts would be replaced with actual cost.
- You will receive additional consulting support for the relevant environmental issues and management problems in this device
ASMETELL JAPAN .INC
Asmetel Japan inc. is a regular primary agent of MG22 (Organic magnetic pyrolysis system)
We are doing questions, consultation and consulting about introduction.
We are doing questions, consultation and consulting about introduction.